PricewaterhouseCoopers (PWC) EVOLUTION 1.0

Project Description

  • Kerfoot were engaged by our clients to complete the upgrade of lighting, emergency lighting, lighting controls, comms and power for levels 14-16 in Tower One, Barangaroo. This included the supply, installation and commissioning of all electrical services to levels 14, 15 and 16 Kerfoot also safely demolished all existing electrical and comms services including redundant supporting systems, old circuitry and control systems. The scope for this project included the installation of electrical services to provide the end user with a simple, modern workspace that encouraged team work and collaboration. Part of these works included the programming and commissioning of the lighting control hardware to ensure the programming specified was seamless and user friendly. The data provided on this project was a key component to ensuring an easy integration with the new AV system which enabled the client to connect and communicate with employees worldwide. On this project Kerfoot installed over 300 light fittings, 200 Power points and 400 data outlets.

Project Accolade

  • Kerfoot successfully delivered this project on time. The initial contract value was just under half the final value, with numerous changes and additions being made over the course of the install. From newly designed charging stations that had never been built before to a 24m curved linear extrusion, this project required innovation from the start. The project enabled Kerfoot to use our proven planning and communication systems to mitigate any risk throughout the duration of the works. This fit out created relaxed open work spaces, modern functional offices and interactive user friendly meeting rooms.

Get in touch.