Project Description
This project consisted of an upgrade to a 50 year old hospital, to create a modern hospital environment to rival any n the state
The milestones consisted of
- 22 bed ward ICU fit out
- Aged care ward fit out
- AYA ward fit out
- Retail fit out
- Executive office fit out
- Gastro ward fit out
- ICU admin staff room fit out
- Transit lounge fit out
- Loading zone
The fit out works consist
- 22 new ICU intensive care beds
- Medications rooms
- Staff stations
- Clean utilities room
- Dirty utilities room
- Storerooms
- Focus rooms
- Training rooms
- Staff rooms
- New amenities for public and staff
- Stock sterile rooms
- Meeting rooms
- Waiting rooms
- Break out area
- Interactive media zone
- Cinema zone
- Creation of an open area
- Dialogue area
- New kitchen HUB area
- Video conference room
- Standing meeting space
- Patient flow
- Reception
- Workforce centre rooms
- External lighting
- Workshop upgrade
The scope of the project involved:
- Strip out and make safe of the existing wards
- Installation of new submain cable from main switch board
- Modification to existing submain cables
- Installation of new distribution boards
- Modification to main switchboards outside the refurbishment area
- Energy metering
- Installation of auto transfer switches
- Installation of new 80KVA UPS
- Installation of new cable containment with seismic restraints
- General power throughout
- General DALI lighting
- Installation of medical examination lights
- Supply Dynalite lighting control throughout
- Emergency evacuation lighting
- Lighting and power final sub-circuits
- Medical services panels
- Medical pendants
- Cardiac protection earthing
- Body protection earthing
- Supplies to mechanical equipment
- Supplies to hydraulic equipment
- ICT horizontal cabling
- Wireless LAN
- Access control
- Intercom
- CCTV cameras
- Duress alarm
- Nurse call system
- Audio visual system
- Hearing aid loop
- Digital clocks
Project Accolade
- This was a design and construct project involving the refurbishment of nine operational wards at Westmead Hospital.
- The project required the Kerfoot team to work in and around a live hospital environment with minimal disruption to hospital operations (including a 22 bed ICU unit).
- The site required the team to work in confined spaces, at heights and in environments which contained asbestos.
- Despite these challenges the team were able manage and oversee all works to deliver an outstanding result, transforming a 50 year old hospital into a state of the art health facility.