Home > Projects > commercial > AIA Sydney

AIA Sydney

Project Description

Kerfoot was awarded a two level office fitout for 345 George Street.

Kerfoot were then involved with the Design and Construct with the consultant to design the stylish but practical office environment.

This fit out consisted of spaces such as

  • Open office area work space
  • Informal meeting rooms
  • Formal meeting rooms
  • Meeting rooms
  • Board rooms
  • Training rooms
  • Kitchens
  • Store rooms
  • Utility rooms
  • Quite rooms

Kerfoot Supplied and installed

  • Switch board upgrades for both level
  • Power
  • Architectural lighting
  • Open space lighting
  • CBUS lighting control system
  • Brand new communications room
  • New Systemax Cat 6A Structured cabling
  • Fibre optics and copper tie cabling
  • UPS installation for the communications network

This project was particular tough as the time frame and programme was extremely short but Kerfoot’s team worked extremely hard to accomplish hand over on time.

The client is now utilising the space and are very happy with their new work environment

Get in touch.