Partners & Projects

St Andrew’s College, University of Sydney.

Kerfoot Services have been providing Electrical Maintenance to St Andrew’s College for over 30 years and across 3 generations. St Andrew’s College is a co-residential academic community within the University of Sydney. It houses over 350 students and a variety of buildings with the oldest dating to the 1870’s.

Throughout the years Kerfoot has been engaged for a variety a works. Lately these works include:

  • Lighting Maintenance
  • LED Upgrades
  • Power Maintenance
  • Additional Power
  • Switchboard Maintenance
  • CCTV Install and Maintenance
  • Fire Maintenance
  • RCD Testing
  • Testing and Tagging
  • Thermal Imaging

Kerfoot Services prides itself on providing St Andrew’s (and all clients) with the highest quality service which is why we have managed to maintain the relationship for over 30 years.

 

Martin Place Siege Memorial

The Lindt Café Siege is a terrible moment that has affected not just Sydney but all of Australia. Tragically, 2 Australians lost their lives during the 16hr standoff between the gunman and Police. The wake of this event saw Australians bound together and Martin Place was turned into a field of flowers by the community to show their unity with those affected.

To honour the lives of those involved The City of Sydney commissioned Architectural Group, Johnson Pilton Walker, to design a Memorial Site in Martin Place. Kerfoot was engaged directly by Johnson Pilton Walker and worked closely with Electrical Consultant, ARUP, and Project Managers, Savills Australia to provide a solution that would highlight the importance of this even in Australia’s history.

The Design created saw of field of flowers being sunk into the existing Martin Place tiles, suspended in time to memorialise those effected. The Electrical component of the works saw Kerfoot installing 6 large spotlights on existing surrounding council Smart Poles. These lights were to turn on with the City Lighting and provide a soft glow on the field.

Kerfoot was engaged to complete a trial of the lighting installation to ensure the lights would give the desired effect. For this trial Kerfoot managed council permits, the delivery and safe storage of plant and material, traffic controlling for the highly populated area. A team of designers, Architects and stake holders replicated the installation of access equipment late at night. The trial was a success with the final design confirmed on the night.

After the success of the trial Kerfoot was engaged for the installation, the install included retro fitted custom brackets to existing council smart light poles to install the directional spot lights to, Connections to the city lighting network to control the lighting along with all testing and commissioning.

Kerfoot worked to a strict timeframe on this project as the city had to unveil the project on the anniversary of the 2014 siege.

The project has been a huge success and the team at Kerfoot are proud to have been a part of such a special project.

Samson Control

Kerfoot Services has had a long-standing relationship with International Production Giant, Samson Controls. Due to this prior relationship Kerfoot Services were engaged to complete Samson Controls Large Factory Relocation project. Their new factory was a 1950’s era building with all existing Electrical Circuits removed. Kerfoot was engaged to complete the design, supply and installation of all Electrical equipment required for Samson to function.

The project included but was not limited to:

  • Supply and Installation of New Switchboards throughout the Factory
  • Supply and Installation of New Submains
  • Supply and Installation of a New Switchboard to replace the 1950’s era Switchboard
  • Cable Reticulation for all Electrical Services
  • Updating of Lighting to LED High Bays
  • Supply and Installation of new Lighting to the building’s exterior for security and safety
  • Supply and Installation of Power and Data cabling to Offices
  • Supply and Installation of Power to Machinery
  • Testing and Commissioning of all equipment.

The period for this project was tight as the client could not afford downtime on their production equipment for an extended period of time. The Kerfoot Team worked tirelessly to ensure that the project was completed on time and under the clients expected budget.

If you are looking to relocate your factory please don’t hesitate to contact our friendly staff at Kerfoot.