Scope of Works
- High End light and Power fit out with a C-Bus lighting control system.
- New Tenant and House DB.
- New Comscope Communications system.
Job Description
With Flexible work spaces demand growing the Level 2 Fit out for Flex and Dialogue was a great success. The high standard of the works completed saw a satisfied client move in and occupy the space within the desired completion time.
The installation challenging and interesting the team at Kerfoot were able to go above and beyond and deliver a complete Light, Power and Communications High Standard project.
Having an enthusiastic end user happy with the achievements and end result of the project, believing that our success in delivering some amazing work spaces and lighting design finishes will only add to their own focus and drive for success.